Diesel Generator Installation and Commissioning
MPS installs diesel generators on site across the UAE: load assessment, foundation construction, mounting, radiator ducts, silencer insulation, cabling, then testing and commissioning before handover.
Process
How an installation runs
Load assessment
Our technical team checks the site, the load and how the generator will be used, to confirm the right size and rating.
Site preparation
Foundation construction and mounting, with access for delivery and future maintenance.
Installation
Radiator ducts, silencer insulation, exhaust and cabling to the distribution and transfer equipment.
Testing and commissioning
The set is tested and commissioned on site before handover.
Planning
What to plan before installation
- Space and weight. Check the dimensions and weight on the model’s data sheet against the site and lifting access.
- Air and exhaust. Generators need cooling air in and hot air and exhaust out, especially in plant rooms.
- Noise. Silent canopy sets publish their noise level at 7 m; check it against any site limits.
- Transfer. Decide between manual changeover and an automatic transfer switch (ATS).
- Fuel. Most sets have a built-in base tank; long running may need extra fuel storage.