Generator Sizing Guide: What Size Generator Do I Need?

Short answer: add up the kW of everything the generator must run at the same time, divide by 0.8 to get kVA, then choose a generator rated at least 25% above that, so it runs at about 80% of its rating. For a 200 kW load that means 250 kVA, so a set rated about 312 kVA: the MPS 385 (350 kVA prime) if it is your main power, or the MPS 330 (330 kVA standby) for backup only.

Size a generator in four steps

  1. List the loads that must run at the same time: lighting, sockets, air conditioning, pumps, lifts, machines. Note each one’s kW.
  2. Add them up to get the running load in kW.
  3. Convert to kVA: kVA = kW ÷ 0.8.
  4. Add headroom: divide the kVA by 0.8 again (about 25% extra), then pick the model whose rating is at or above that figure. Use the prime rating for main power and the standby rating for backup.

Generator size by load

Recommended MPS model for each running load, with 25% headroom. Use the prime column if the generator is your main power source and the standby column if it only covers outages.

Running load (kW)Load (kVA)Rating needed (kVA)Main power (prime)Backup only (standby)
81012MPS 15 (13 kVA prime)MPS 15 (15 kVA standby)
151923MPS 50 (45 kVA prime)MPS 50 (50 kVA standby)
253139MPS 50 (45 kVA prime)MPS 50 (50 kVA standby)
405062MPS 88 (80 kVA prime)MPS 88 (88 kVA standby)
607594MPS 110 (100 kVA prime)MPS 110 (110 kVA standby)
80100125MPS 150 (135 kVA prime)MPS 150 (150 kVA standby)
100125156MPS 220 (200 kVA prime)MPS 165 (165 kVA standby)
150188234MPS 330 (300 kVA prime)MPS 275 (275 kVA standby)
200250312MPS 385 (350 kVA prime)MPS 330 (330 kVA standby)
300375469MPS 550 (500 kVA prime)MPS 550 (550 kVA standby)
400500625MPS 700 (650 kVA prime)MPS 660 (660 kVA standby)
500625781MPS 1000 (900 kVA prime)MPS 1000 (1,000 kVA standby)
600750938MPS 1100 (1,000 kVA prime)MPS 1000 (1,000 kVA standby)
8001,0001,250MPS 1650 (1,500 kVA prime)MPS 1650 (1,650 kVA standby)
1,0001,2501,562MPS 1875 (1,710 kVA prime)MPS 1650 (1,650 kVA standby)
1,2001,5001,875MPS 2250 (2,000 kVA prime)MPS 1875 (1,875 kVA standby)
1,4001,7502,188MPS 2500 (2,250 kVA prime)MPS 2250 (2,250 kVA standby)

Above 1,400 kW, or for critical sites, we size single large sets or several synchronized generators. Synchronization and ATS panels.

Frequently asked questions

What size generator do I need for my building?

List every load that must run at the same time and add up the kW (it is on each equipment nameplate or bill of materials). Divide by 0.8 for kVA, add 25% headroom, and use the table above. Send us the load list and we will check it.

How do I convert kW to kVA?

Divide kW by the power factor. MPS generators are rated at 0.8 power factor, so kVA = kW ÷ 0.8 and kW = kVA × 0.8. A 100 kVA rating is 80 kW.

Should I size on the prime or the standby rating?

If the generator is your main power source or runs every day, size on the prime rating. If it only covers grid outages, size on the standby rating. See prime vs standby ratings.

What about motors, pumps and air conditioning?

Electric motors draw much more current for a moment when they start than when they run. If your load includes large motors, pumps, compressors or chillers, list the biggest one separately so we can check the generator can start it.

Is a bigger generator always safer?

No. A generator that runs at a very low load uses more diesel for each kWh it produces, as the MPS data sheets show. Aim for a real load of about 70 to 80% of the rating. See the fuel consumption chart.