Jafza One, Jebel Ali Free Zone, Dubai +971 4 874 2229  ·  info@mpsfze.com
MPS logo M Energy Power SolutionDiesel generators · Dubai, UAE

Generator Synchronization and ATS Panels

Synchronization lets two or more generators run in parallel and share the load. An automatic transfer switch (ATS) starts your standby generator and switches the supply when the grid fails. MPS sets up both, for new and existing installations.

Synchronization

Our synchronization systems are set up for fuel efficiency, load sharing, paralleling operation and manual modes, based on how your site runs.

  • Load sharing: paralleled sets split the load, so each runs nearer its efficient range.
  • Redundancy: if one set needs maintenance, the others keep supplying power.
  • Growth: capacity can be added later with another set rather than replacing one large unit.

Automatic transfer switches

With an ATS, a standby generator starts automatically when mains power fails and takes over the load, then hands back when the grid returns. MPS data sheets list two ATS options:

Contactor or breaker type ATSOption on MPS generator sets
Motorized changeover type ATSOption on MPS generator sets
ControllerDSE controllers with AMF (automatic mains failure) operation on most models
FAQ

Common questions

Do I need synchronization or one larger generator?

It depends on your load profile and how critical the supply is. Several smaller synchronized sets give redundancy and can run more efficiently at low load; one large set is simpler. We assess this during the load assessment.

Can you add an ATS to an existing generator?

Usually yes, depending on the generator’s controller and the site’s electrical setup. Send us the make, model and kVA.

Do you synchronize generators from other brands?

Ask us with the details of your existing sets and controllers, and we’ll advise what’s possible.

Need paralleled sets or automatic changeover?

Tell us your load, the number of generators and how the site runs.

Call WhatsApp Get a quote